Hampstead School Lift Shaft
Owing to the intake of a disabled child, Hampstead School on behalf of the London Borough of Camden required a new lift and shaft to be constructed to allow the child access. The shaft and lift was constructed in a raised courtyard, in keeping with the existing 1960's style building.
£220,000.00 contract value
24 week contract duration
|